Project 1153 "Eagle" | ||
---|---|---|
Summary | ||
Type | Supercarrier | |
Flag state | Union of Sovereign Soviet Siberian Socialist Republics of the Soviet Union | |
Accessory | Union of Sovereign Soviet Siberian Socialist Republics of the Soviet Union Navy | |
Preceded by | Project 1160 Eagle (1983: Doomsday) | |
Succeeded by | Admiral of the Fleet of the Union of Sovereign Soviet Siberian Socialist Republics of the Soviet Union Flota Sovetskogo Soyuza Kuznetsov class aircraft carrier (1983: Doomsday) | |
Shipyard | Black Sea Shipyard (1983: Doomsday) | |
The current status of |
In service | |
Options | ||
Displacement | 72 000 tons of the total | |
Lenght | 320 m | |
Technical data | ||
Power plant | Yasu (1983: Doomsday) | |
Rate | 29 knots | |
Cruising Range | Not limited | |
Armament | ||
Flak | 16 × 6 30-mm no. installations | |
Antiship weapons | 20 × PU SCRC Granite (1983: Doomsday) | |
Antisubmarine armament | 2 × 12 RBU (1983: Doomsday) | |
Anti-aircraft Missiles |
4 × SPAR (1983: Doomsday) 2 × SAM (1983: Doomsday) super short-range 4 × SAM (1983: Doomsday) of short-range | |
Air group | 50-60 planes and helicopters |
The The draft code of 1153 "Eagle" - the Soviet program to develop the "big cruiser with air armament displacing about 70 tons of nuclear power plant, which began in 1976 at the Nevsky PKB on the basis of Project 1160 Eagle (1983: Doomsday). Was the chief designer of VF Anikeev. The lead ship of the class was put into operation in 1985 and the last ship in 2007.
Project 1153 - aircraft carrier ship that can carry up to 50 aircraft types MiG-23K, Su-25K and Su-27K with the ability to run a piston catapults, has successfully developed the proletarian factory. Compared with the project in 1160 called for less at 10,000 tons displacement, reduction of the air group, the construction of two ships instead of three. In addition to the air group the ships were to carry 20 anti-ship missile launchers below deck missile system P-700 Granit . Derating compared to the draft in 1160 was associated with a decrease in the budget after the construction of the third aircraft carrier - Soviet aircraft carrier Novorossiysk (1983: Doomsday). Ships of the project in 1153 were to enter service by 1985.
Project 1153 Eagle is the first large Soviet aircraft carrier class with nine supercarriers built for Union of Sovereign Soviet Siberian Socialist Republics of the Soviet Union Navy. The aircraft carriers carry up to 60 aircraft. The class was succeeded by Admiral of the Fleet of the Union of Sovereign Soviet Siberian Socialist Republics of the Soviet Union Flota Sovetskogo Soyuza Kuznetsov class aircraft carrier (1983: Doomsday) in 1990.